The repeater was installed November 18, 2021 by AF7PR and N7ER.

The repeater was built by N7ER after several failures of the new 220 Bridgecom repeater.

Repeater is a dual 220 factory set of CDM 1550’s with the STM-32 Interface.

This is our 4th DMR repeater installed on Baldi Mtn, a site at 4000 feet southeast of Tacoma